Fulton Market Streetscape - Section II
(N. Ogden Ave - N. Carpenter St)

Scope of Work

- ADA ramp installation

- Bituminous surface removal & replacement

- Catch basin adjustment & installation

- Curb / Gutter removal & replacement

- Drainage structure installation & removal

- Driveway removal & replacement

- Electrical distribution system installation

- Existing street light removal

- Granite cobblestone removal & salvage

- Irrigation system installation

- Landscaping

- Lighting installation & removal

- Pavement marking installation

- Paver installation

- Potable water system installation

- Roadway reconstruction

- Sidewalk replacement

- Sidewalk vault removal & replacement

- Signage installation

- Soil / Plant material installation

- Street furniture furnishing & installation

- Tree / Tree grate installation

- Utility adjustment