top of page
Ravenswood Sewer Improvement
Site 01
  W. Farragut Ave (N. Ravenswood (E) - N. Paulina St);
  N. Paulina St (W. Farragut Ave - W. Berwyn Ave);
  W. Berwyn Ave (N. Paulina St - 540' E.) 
Site 02
  N. Ravenswood Ave (W) (W. Balmoral Ave - W. Farragut Ave)
Site 03
  W. Winona St (N. Winchester Ave - N. Wolcott Ave)
Site 04
  W. Highland Ave (N. Ravenswood Ave (E) - N. Paulina St);
  N. Hermitage Ave (W. Highland Ave - W. Thome Ave)

Scope of Work

- Catch basin installation

- Concrete collar connection construction

- Curb restoration

- Drain connection installation

- Ductile iron pipe sewer installation

- Excavation backfilling & compaction

- Existing sewer abandonment & removal

- Existing water main abandonment & capping

- Grading

- Inlet installation

- Landscaped area restoration

- Manhole installation

- Pavement restoration

- Reinforced concrete elliptical pipe sewer installation

- Reinforced concrete pipe sewer installation

- Temporary water main support installation

- Traffic control & protection

- Trenching

- Tumbling basin installation

- Walkway restoration

bottom of page